Ipswich |
|
|
This busy railway centre sees main line and cross-country passenger services, as well as a large amount of freight traffic - especially to the major container port of Felixstowe.
Many of the locomotives needed for this traffic make use of the stabling and fuelling point adjacent to the passenger station.
The area controlled by this simulation includes East Suffolk junction, Halifax junction and the busy Ipswich Yard.
Ipswich is one of our Classic Series simulations.
To be run using our PC-Rail Plus software.
|
|
|
Level: Moderate |
Standard timetable: 1997 SX, 117 trains (9.3 hours)
|
|
|
Current Version: 5.21 (28/01/24) |
Extra timetable: 2001/02 SX, 415 trains (24.0 hours) |
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|