Stoke Junction |
|
|
The ultimate Heritage simulation? It is certainly a very challenging one, with 88 levers and 12 block instruments to be worked. It was a LNW box, double manned and hectic with trains apparently coming from every direction.
The timetable is from the early 1950's for a full 24 hours and includes over 500 train movements.
Anyone who dares to take on this simulation will have lots of fun!
Stoke Junction is one of our Heritage Series simulations.
To be run using our PC-Rail Plus software.
See a video demonstration of this simulation.
|
|
|
Level: Challenging |
Standard timetable: 1952/53 SX, 559 trains (24.0 hours)
|
|
|
Current Version: 5.20 (18/08/22) |
|
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|