signal_image PC-Rail Simulations


HomeOur SimulationsGetting startedSupportYour AccountSubscribe
Available Simulations

Manchester Piccadilly SCC

Modern Series


pictureManchester Piccadilly has 14 platforms, 12 of which form a terminus station plus 2 through platforms to Oxford Road, Deansgate, North West destinations and Trafford Park Euro freight terminal.

There are six parallel approach lines to Piccadilly station and the simulation covers an area including Styal, Manchester Airport, Longsight Depot, Ardwick station and TMD, Oxford Road and Deansgate.

The very busy timetable is for 2016, with 400 trains over a 12 hour period.

Note: this is a totally new simulation using the latest software, the current track layout and signalling installation. Timetables produced for our previous (2005) Piccadilly simulation are not compatible with this new simulation.

Manchester Piccadilly SCC is one of our Modern Series simulations.

To be run using our PC-Rail Plus software.


Level: Difficult Standard timetable: 2016 SO, 494 trains (12.0 hours)
Current Version: 5.21 (16/12/20)  

Download Manchester Piccadilly SCC Free
Register for Unlimited Use £33.00 *

* See also our Subscription Option for unlimited access to ALL current and future simulations.