Manchester West |
|
|
This simulation covers a complex area west of Manchester having 13 stations, multiple junctions, and the large Trafford Park Euro Freight Terminal. It also includes the new Ordsall Chord connecting Manchester's three main stations, which opened in 2017 accompanied by major resignalling.
The 2020 timetable has 424 trains, with details including routings and the loco and multiple unit classes used.
Manchester West is one of our Modern Series simulations.
To be run using our PC-Rail Plus software.
|
|
|
Level: Quite difficult |
Standard timetable: 2020 SX, 424 trains (13.0 hours)
|
|
|
Current Version: 5.21 (08/11/21) |
|
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|