Crewe 1950's Layout |
|
|
Not one for the faint-hearted, this huge simulation brings us the wonder of Crewe at its peak in the days of steam. The routing of trains to the station's 6 through platforms and 10 bays is complex, especially where loco changes are required and there are many loco movements to/from shed.
The weekday timetable includes over 300 trains over an eight hour shift, with full loco details provided.
This simulation is dedicated to those Signalmen who worked at the various Crewe boxes and dealt with such tremendous volumes of passenger and other traffic.
Crewe 1950's Layout is one of our Nostalgia Series simulations.
To be run using our PC-Rail Plus software.
|
|
|
Level: Difficult |
Standard timetable: 1950s SX, 311 trains (8.2 hours)
|
|
|
Current Version: 5.21 (30/11/20) |
|
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|