Shrewsbury Area |
|
|
Six routes converged on Shrewsbury so it was a very busy and interesting railway hub. The simulation depicts the layout in the immediate postwar period and includes the many goods yards in the area in addition to the passenger station.
The timetable supplied demonstrates the service in 1949/50, when freight still played a prominent rĂ´le. Many trains, both passenger and freight, changed engines here so there were many movements to and from the two loco sheds.
Shrewsbury Area is one of our Nostalgia Series simulations.
To be run using our PC-Rail Plus software.
|
|
|
Level: Quite difficult |
Standard timetable: 1949 SX, 937 trains (24.0 hours)
|
|
|
Current Version: 5.21 (17/11/23) |
|
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|