signal_image PC-Rail Simulations


HomeOur SimulationsGetting startedSupportYour AccountSubscribe
Available Simulations

Birmingham New Street

Modern Series


pictureBirmingham New Street is a major hub of Britain's railway system, with routes to London, the North-East, the North West, Scotland, Wales, the South West, the South Coast and the East of England. Many local services serving the West Midlands also use New Street. Currently 1.71 million passengers use New Street each year.

It has 12 through platforms (each sub-divided into A and B sections), one bay platform, two dock platforms, three through sidings and two engine sidings. The simulation area contains the station itself and the complex series of junctions just outside it. Proof House and Grand Junctions reflect the layout now left after the major remodelling in 2000 and the station itself reflects the post-2004 layout.

The timetable covers the morning of the weekday service in mid-2012 from the service start-up until noon. Over 450 trains will require signalling.

Needless to say this is a very busy and demanding simulation - but an immensely enjoyable challenge!

Birmingham New Street is one of our Modern Series simulations.

To be run using our PC-Rail Plus software.


Level: Difficult Standard timetable: 2012 SX, 463 trains (8.0 hours)
Current Version: 5.21 (30/09/25)  

Download Birmingham New Street Free
Register for Unlimited Use £34.00 *

* See also our Subscription Option for unlimited access to ALL current and future simulations.