This modern-day (2025) simulation covers a distance of 35 miles on the Up and Down Main lines between Congleton and Hixon, with Stoke-on-Trent being approximately halfway between.
A number of important junctions are to be controlled, including those to Norton Bridge, the Potteries Line towards Crewe, and to the Derby line. With many level crossings, passing loops and 7 stations there is plenty to keep the operator busy!
This is a busy mixed traffic location where fast non-stop expresses, local stopping trains and freight traffic share the same tracks, so any delays can quickly snowball!
Operation of this new simulation is very different from our earlier Stoke-on Trent PSB simulation, set in the late 1960's, which is still available in our Nostalgia series. Registered users of the earlier simulation will receive a 20% discount on purchase of this new one.
Stoke-on-Trent SCC is one of our Modern Series simulations.
To be run using our PC-Rail Plus software (version dated 29/01/26 or later recommended).
Level: Moderate
Standard timetable: 2025 SX, 274 trains (24.0 hours)