London Marylebone |
|
|
Our biggest and busiest Heritage simulation yet! Also the most challenging, with the authentic semaphore signalling and block working.
The timetable is for a weekday in Summer 1959 and covers a full 24 hours, with full loco details. All trains are of course steam-hauled into the terminus station, resulting in many loco movements being required.
London Marylebone is one of our Heritage Series simulations.
To be run using our PC-Rail Plus software.
|
|
|
Level: Difficult |
Standard timetable: 1959 SX, 330 trains (24.0 hours)
|
|
|
Current Version: 5.11 (21/12/23) |
|
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|