Crewe Power Box |
|
|
This classic real-life railway location really keeps the operator very busy.
A rich mixture of West Coast main line expresses, together
with all the connecting cross-country and local services.
The timetable included features push-pull working of main line trains as
well as the Euston-Holyhead service which requires a loco change (electric to
diesel and vice versa).
Crewe Power Box is one of our Classic Series simulations.
To be run using our PC-Rail Plus software.
|
|
|
Level: Moderate |
Standard timetable: 1990 SX, 195 trains (8.5 hours)
|
|
|
Current Version: 5.21 (12/06/23) |
Extra timetable: 2004 SX, 507 trains (24.0 hours) |
|
* See also our Subscription Option for unlimited access to ALL current and future simulations.
|