signal_image PC-Rail Simulations


HomeOur SimulationsGetting startedSupportYour AccountSubscribe
Available Simulations

Crewe Power Box

Classic Series


pictureThis classic real-life railway location really keeps the operator very busy. A rich mixture of West Coast main line expresses, together with all the connecting cross-country and local services.

The timetable included features push-pull working of main line trains as well as the Euston-Holyhead service which requires a loco change (electric to diesel and vice versa).

Crewe Power Box is one of our Classic Series simulations.

To be run using our PC-Rail Plus software.


Level: Moderate Standard timetable: 1990 SX, 195 trains (8.5 hours)
Current Version: 5.21 (12/06/23) Extra timetable: 2004 SX, 507 trains (24.0 hours)

Download Crewe Power Box Free
Register for Unlimited Use £27.00 *

* See also our Subscription Option for unlimited access to ALL current and future simulations.