signal_image PC-Rail Simulations


HomeOur SimulationsGetting startedSupportYour AccountSubscribe
Available Simulations

Norwich

Classic Series


pictureThis simulation features an interesting layout, with train services on 4 routes converging on the terminus station. The area includes the large Crown Point depot, as well as Trowse Swing Brige and Whitlingham Junction.

The Norwich area, as represented in this simulation, is largely controlled from one panel of Colchester Area Signalling Centre. These arrangements date from 1987, when electrification and resignalling of the route between Colchester and Norwich was completed. The resignalling of the Cromer line in 2000 included Whitlingham Junction.

Norwich is one of our Classic Series simulations.

To be run using our PC-Rail Plus software.


Level: Quite easy Standard timetable: 2004/05 SX, 186 trains (11.2 hours)
Current Version: 5.21 (07/06/23) Extra timetable: 2010 SX, 313 trains (24.0 hours)

Download Norwich Free
Register for Unlimited Use £27.00 *

* See also our Subscription Option for unlimited access to ALL current and future simulations.